Temenos Transact
R24 AMR | Min(s) read

Introduction to Miscellaneous Deal

Content enriched:
New structure and revised (Docs 2.0)

A guarantee is an undertaking by one party (the guarantor) to stand behind specific obligations (current and future) of a third party (Principal). The Guarantor agrees to compensate the Beneficiary of loss (up to a specified amount) when the third party (Principal) defaults or fails to fulfill the obligations under the guarantee.

A guarantee is:

  • A security for performance of a contractual obligation
  • An irrevocable undertaking from a guarantor
  • A commitment independent of the obligations of its underlying contract
  • A guarantor’s assurance towards beneficiary whereby the guarantor replaces the client’s (principal’s or applicant’s) credit worthiness with its own
  • The guarantor undertakes to pay a specific sum of money to the beneficiary in the event of non-performance or default by the client (principal or applicant).

Understanding Guarantees in Temenos Transact

The Miscellaneous Deals (MD) module provides the facility to record guarantee undertaking, which are off balance sheet. The principal amounts involved are booked as contingent entries. Temenos Transact uses the MD module to record different guarantee type transactions on the banks’ books. These range from straight forward guarantees (issued and received) to more specific trade finance related deals (bid and performance bonds). It allows forward dated contracts and collection of charges using standard FT.CHARGE.TYPE and FT.COMMISSION.TYPE tables respectively. Additionally, customised delivery advices can be generated. The MD.DEAL contracts can be linked to the LIMIT and COLLATERAL modules and this parameter setting can be changed at the contract level.

The types of deals that are entered in MD.DEAL are related to contingent liability or assets. The main feature is that the risk is recorded off balance sheet otherwise known as below the line. There are options to utilise the LIMIT updates at contract level, ability to levy charges or commissions and the number of deal types that can be entered.

The below shown is letter of guarantee cycle:

Configuring MD.DEAL

The configuration required for MD.DEAL is defined in the below parameter tables:

Some of these fields are explained below:

MD Build Sequence

The order in which these files should be created is stored within the automated tool for IM. The order sequence in the ascending build reference order is given in the left. Mandatory tables are indicated with a red star mark and optional tables in blue colour.

Wherever there are dependencies for filling up values in the tables in build sequence, the dependencies are shown on the right.

Copyright © 2020- Temenos Headquarters SA

Published on :
Tuesday, May 28, 2024 7:04:48 PM IST